Senin, 09 Juni 2014

the onset of the rainy season.

the onset of the rainy season. The use of a short segment cuttings, can be done but it must be through nursery / nursery first. While the seed material, originating from short cuttings of at least 2 sides.
ituPoker.com JUDI POKER, AGEN POKER, AGEN SITUS TARUHAN BANDAR JUDI POKER ONLINE INDONESIA TERPERCAYASeedbed Soil dug as deep as approximately 20 cm, then smoothed and cleaned of all the grass and the remains of plant roots. Map width of 1 to 1.2 meters long, tailored to the needs. Each plot is limited by drainage / street, the size of each ditch with a width of 30 cm and within 20 cm. Clay soils need to be coated sand as thick as 5-8 cm, centralized media / land for breeding done 2 weeks before planting. The pile is given a roof of woven bamboo, reeds or palm leaves. Leaf buds over, dumped one third to half parts and leaves do not hit the ground. Age seedbed 3-4 weeks until the roots have not sempurnaditeruskan 5 - 6 weeks until the roots perfectly. Nurseries Provide plastic bags, diameter 10 cm height 15 cm with perforated as many as 10 holes. Media used, soil and sand 7 versus 3. Two weeks prior to planting, the media should be sterilized first. Basic fertilizer 0.5 g / kg of soil, carried out 10 days after the sterilized medium. Removal, should be Puteran. Intensity of 50%. The duration of nursery until ready for planting, is when having 4-6 leaves (3-5 months). Land management. Soil dug 1.5 meters wide pathway made, in middle lanes made enforcement of the planting hole to plant 30 x 30 x 40 cm. Road boundary is the channel, width 30 cm in size 15 cm. Tree protective, planted one year before planting vanilla, tree used ie dadap, lamtoro, kapok, Suren or tamarind, established shade trees that branching occurs 2 feet off the ground. Maintenance of shade trees, that is by beheading or romposen.
SenangPoker.com Agen Judi Poker Online Terpercaya IndonesiaCultivation Two to four months before planting, made a hole 30 cm from the base learned to deep trunk 10-15 cm. Hole given manure, preferably impurities originating from the chicken should not be used. Planting, conducted in beginning of the rainy season. Cuttings were planted 3 sections, immersed in soil horizontal. Maintenance, watering by means of irrigating drainage and during the dry season. Stitching is done immediately when the plant abnormal or dead. Fertilizer, organic fertilizer (manure) is given at the time of planting and repeated a year 1-2 times as much as 1-2 cans per tree. Organic Fertilizer 4 kg N per hectare, 8 kg K, 2 kg of P, Ca 5 kg, 5 kg and 4 kg Mg Cl. Fertilizer leaves, Gandasil, wukal, treatment of 1-2 weeks. Setting plants vanilla, vanilla plant propagation, at a height of 2 meters on tree protector / enforcer tied rope fibers or bamboo horizontally in between shade trees. When tendrils embedded in the bottom of the soil vine plants by releasing first, then 50-60 of the vanilla plant long coiled at the base of the tree immersed enforcement. Excess fence systems, plant maintenance treatment levels or relative low, the wind is not so influential as well as the effectiveness of land high. While the lack of fencing system search, the difficulty in maintenance of plant health, difficulties in treatment pollination / wed and lower production levels. Individuals propagation system (single support) Vanilla plants propagated vertically, on each tree protector / enforcer how there are 2 kinds: curvature back and forth, after reaches a height of 2 meters vanilla plant is curved in a way hung on a tree branch enforcement after dijuntai 1BUNDAPOKER.COM AGEN TEXAS POKER DAN DOMINO ONLINE INDONESIA TERPERCAYA .5 meters, the tip directed back to the top of the plant. Tassels systems, such as systems back and forth after the end of the plant to 50 cm of soil, and cut bud

Tidak ada komentar:

Posting Komentar